Hook Plate
We’re using traditional roofing techniques that are commonly used throughout the construction industry when vents or other ducting equipment are added to the roof. A secondary piece of the same roof covering is used over the top of the Hook Plate and hot welded to the existing to ensure a weather tight seal.
It’s suitable for cold and warm roof constructions.
On a cold roof, where the insulation sits below the roof deck, the Hook Plate fixes through the membrane or bitumen covering and into the deck below. This deck can be made from steel, timber or concrete, but this doesn’t affect the Hook Plate system as we’ll ensure you’re supplied with the most suitable screw depending on the deck material. With up to 8 fixing holes per Hook Plate, the system has a secure connection without disturbing the main structure.
It’s a similar process for a warm roof, where the insulation sits above the roof deck, except in this case we fix through all the layers into the roof deck. For these warm roofs it’s important to protect the insulation from any gaps around the fixings that can allow the heat to escape. This is why we supply thermal tubes to prevent this from happening. They sit within the fixing hole of the Hook Plate and seal the hole to stop heat from escaping